A week-by-week plan of the lessons (Autumn 1). This is a teaching sequence for the resources — not an operational staff planner.

WeekLesson & focusFlow (arrival → model → independent)EvidenceLundy
W1The Workshop Audit
Health, safety & tool identification
2×2 hazards recap + hazards wordsearch → MODEL: Fatal Four + safe handling → INDEPENDENT: guided risk assessment (Standard/Supported)Documentarian photo of safe tool use + witness tickVOICE — vote the community asset
W2The Blueprint
Measuring, marking & numeracy
2×2 mm recap + tool wordsearch → MODEL: measure twice/try square → INDEPENDENT: transfer blueprint dimensions / trace templatesPhoto of correct try-square use, annotatedAUDIENCE — partner signs off measurements
W3The Core Cut
Material processing
2×2 saw recap + material wordsearch → connection-before-correction → MODEL: clamp + handsaw → INDEPENDENT: cut to sizePhoto of clamped set-up; 'kept it safe by…'INFLUENCE — adapt the design, don't waste wood
W4The Assembly
Joining & structural integrity
2×2 joining recap + wordsearch → MODEL: pilot holes/countersink → INDEPENDENT: assemble componentsClose-up joint photo, annotatedVOICE — explain a joining choice
W5The Finish
Quality control & weatherproofing
2×2 surface-prep recap + sanding wordsearch → MODEL: rough vs fine + safe treatment → INDEPENDENT: sand/treat/inspectBefore/after finish photosAUDIENCE — class quality-control check
W6The Handover
Evaluation & portfolio launch
2×2 journey recap + evaluation wordsearch → MODEL: evaluate vs blueprint → INDEPENDENT: collate & annotate portfolioFinished-asset photo; lock predicted gradeINFLUENCE — community benefit + report back

Weeks 7–8

Finish/overflow, strengthen evidence, and complete the ASDAN Vocational/D&T portfolio — then agree the first Autumn-2 construction step. Each week opens its pack from the unit hub.